Completed in Germany in 2024, this 161 m² project provided an ISO 7 clean environment for automotive component operations. The client required the clean space to fit an overseas site and its equipment layout, so the enclosure had to be coordinated with the building conditions rather than treated as a standalone box. The SAC modular cleanroom was assembled on site using a wall-and-ceiling package. Its scope also covered HVAC and filtration, lighting, electrical systems, automation, monitoring, commissioning, and validation. In this form of cleanroom construction, each cleanroom partition wall helps define the controlled area while service connections are planned around the operational footprint. The recorded delivery period was two months. The case demonstrates the use of a compact, site-assembled solution for an industrial application outside pharmaceuticals. It does not disclose the manufacturer, equipment specifications, or measured production outcomes.
Provide approximately 161 m² of ISO 7 clean space for automotive component operations and adapt it to the overseas site and equipment layout.
A site-assembled SAC modular cleanroom provided 161 m² of ISO 7 space for automotive component operations in Germany.
프로젝트 패키지를 완전한 시스템으로 조율하여 설계부터 적격성 평가까지 건축, 기계 및 제어 인터페이스의 일관성을 유지했습니다.
공정, 청정도 등급 및 일정 요구 사항을 알려주세요. 팀에서 적합한 PAC 또는 SAC 방식을 제안해 드립니다.